Rezoning Balfour Block – 906-982 West 18th Avenue
Motion 54 · Council Meeting, July 29, 2026
Summary
- A rezoning application for the Balfour Block (906–982 West 18th Avenue, 907–975 West 19th Avenue, and 3403–3415 Laurel Street) proposes a phased redevelopment replacing the existing CD-1 zoning with a mix of new zones to enable diverse housing types and a new public park.
- Phase One would rezone one parcel to RR-2B to allow a six-storey rental building with approximately 90 units at a maximum 2.7 FSR, and rezone other parcels to R1-1 (Residential Inclusive) to allow up to four-unit multiplex developments on each lot.
- A 374.4 sq. m permanent public park is proposed at the southeast corner of the block, to be zoned CD-1 limited to Park use and transferred to the City upon completion.
- The rezoning involves both privately owned land and narrow City-owned road frontage strips (the south 7 feet of several lots), which are to be incorporated into the new lot configuration as part of a land exchange tied to the park dedication.
- Future building designs for individual lots will be reviewed through the development permit process, with public consultation at that stage.
- The General Manager of Planning, Urban Design and Sustainability recommends approval in principle, subject to conditions including a Housing Agreement By-law for the rental building.
Report Images
Public comments
Read all 2 statements
Transcript
65 segments
My name is Oscar Erickson, and I'm the rezoning planner for this rezoning application at 906 to 982 West 18th Avenue, 907 to 975 West 19th Avenue, and 3403 to 3415 Laurel Street, also known as the Balfour Block.
The site shown in red is located just east of Oak Street, between Laurel Street, 18th and 19th Avenues. The surrounding neighborhood consists of single detached houses and to the west, low-rise rental buildings along Oak Street. The site is located 900 meters south of the future Oak VGH SkyTrain station and is currently occupied by 17 rental duplexes constructed in the 1950s. There are tenants on site eligible for protection under the Tenant Relocation and Protection Policy.
Land use and height are consistent with the residential low-rise generalized land use designation of the Vancouver Official Development Plan. This designation supports a range of residential tenures up to six stories. The southeast corner of the site is proposed as public open space and is consistent with the park and open space designation of the ODP.
The site is located within the Canby Corridor plan area and is identified as a unique site. The plan anticipates a mix of townhouses, low-rise and lower mid-rise buildings with 25% of the net new rental floor area to be below market rental units. It also calls for integrated public open space and seeks to secure a childcare facility on the site. While the site does meet the site's threshold for the rezoning policy for sustainable large developments, given the project is seeking to rezone to lower density through district schedules, there are limited opportunities to land this policy on the site. Staff worked with the applicant to ensure the delivery of rental housing and the retention of the park at the southeast corner, in part responding to the objectives of the city's policies.
TO PROVIDE SOME BACKGROUND, THIS REZONING APPLICATION FOLLOWS A PREVIOUSLY APPROVED CD1 REZONING APPROVED AT PUBLIC HEARING IN 2022 AND ENACTED IN 2024. THE 2022 APPROVAL CHANGED THE ZONING FROM RESIDENTIAL RT2 TO CD1 AND INCLUDED A COMPREHENSIVE PROPOSAL WITH 51 STRATA UNITS, 58 STRATA TITLED TOWN HOMES AND 99 RENTAL UNITS, INCLUDING 25 UNITS OF BELOW MARKET HOUSING. THE PROPOSAL ALSO SECURED A 570 SQUARE METER PUBLIC PARK AND A 37 SPACE CHILD CARE FACILITY.
THE REZONING APPLICATION BEFORE COUNCIL TODAY SEEKS TO REVISIT THE 2022 REZONING AND ITS SUBSEQUENT ENACTMENT. The applicant has indicated that due to changing market conditions, the existing zoning with its secured public benefits is no longer economically feasible. The applicant is now seeking an alternative way to move the project forward and has identified this proposal as a viable option. Should the current proposal be approved by Council, previously secured public benefits such as the childcare facility and below-market rental housing will be foregone.
The applicant is proposing to subdivide the site and rezone to standard zoning districts. Lot 1, here shown in yellow, would be rezoned to our R2B district, allowing for a six-story rental building. And lots 2 to 20, here shown in purple, would be rezoned to R11, each permitting a four-unit multiplex development under fee-simple ownership. PARCEL AT THE SOUTHEAST CORNER OF THE SITE WILL BE CONVEYED TO THE CITY FOR USE AS A PUBLIC PARK. THIS PARCEL WILL BE REZONED TO A CITY ONE DISTRICT LIMITED TO PARK USE. staff note that the park secured under the previous proposal was larger at 570 square meter compared to the park parcel secured under this proposal at 375 square meters. As the enactment of the 2022 rezoning reflected the park commitment in the ODP, staff also note that although this park is smaller than illustrated in the ODP, it still meets the intent of securing a public park on the site. Administratively, the city will undertake a land exchange. The city frontage lands, being a city-owned seven-foot-wide frontage strip along 19th Avenue, shown in the diagram within a purple dashed line, will be exchanged for the park parcel. A service lane is required for the planned multiplex developments, and the lane will be secured through a dedication.
Architectural drawings are not submitted for a standard district rezoning. Instead, the form of development is reviewed at the development permit stage. The RR2B and R11 district schedules set out the expectations for the built form that can be anticipated.
In order to facilitate the earlier delivery of the RR2B rental building and lane, and to minimize disruption to tenants, the rezoning process will occur in two phases. In Phase 1, the developer will develop the land north of the lane. Once the Stage 1 building permit for the RR2B rental building is issued and all other associated conditions are satisfied, the developer can proceed to Phase 2, which includes conveyance of the park to the city and development of the lot south of the lanes. To conclude the process, the current City 1-884 will be repealed together with the public benefits secured at that time.
A virtual Q&A period was held, and in total, 88 pieces of correspondence were received. Support was expressed for the addition to the housing stock, the proposal's improved neighborhood fit, the proposed lower density, and the housing options that the proposal offers.
Concern was expressed for tenant displacement, the loss of the previously secured public benefits, building height, and impact to neighborhood character. In response, staff note that the applicant is required to provide tenant compensation based on length of tenancy, support finding interim housing, and their right to return to the new rental building at existing rents. Further, the proposed rezoning would result in a lower overall density compared to the previous proposal. While this change results in a reduction of the previously secured public benefit, it continues to secure a public park for the community. The proposed six-story rental building will comply with the RR2B district schedule. This zoning framework was created through a comprehensive citywide policy process designed specifically to guide the development of new rental housing across Vancouver, ensuring consistency, predictability, and compatibility with the city's broader housing goals. I also note that the anticipated form of development under this proposal reflects a reduction in density, thereby providing a smoother and more compatible transition to the surrounding single detached houses in the immediate area.
With the application approved, the project is expected to provide a total of 2.7 million in DCL contributions. It would also deliver approximately 90 market rental units and secure a public park.
In conclusion, this proposal is consistent with the ODP and delivers the replacement rental housing and public park identified in the Canby corridor plan. However, it falls short in delivering a childcare facility and the below market housing component originally anticipated. Staff have worked closely with the applicant to arrive at the viable proposal and while recognizing the reduction in public benefits are bringing this application forward for council's consideration. Staff recommend approval subject to conditions outlined in Appendix B. Staff and the applicant team are available to respond to any questions. Thank you.
Good morning, Mayor and Council. My name is Evan Lewis. I'm Senior Director of Development with West Group Properties. As you heard, we were asking for council to approve a reduction in density to this site. The application voluntarily reduced the allowable density by approximately 80,000 square feet, a reduction of roughly 40%. In its place, we envision a 95-unit rental building under RR2B, together with 20 front and back duplexes under R11 zoning. This form is consistent with the official development plan and, importantly, is highly consistent with the character and scale of the surrounding neighborhood. This decision was not made lightly. Following approval of the previous higher density rezoning, West Group made good faith efforts at significant cost to advance that scheme. We developed and submitted development permit and building permit drawings for all phases, paid the associated fees, and advanced the process to the point that many of those permits were issuable. We even leased out, built out, and furnished a nearby sales center, which is currently sitting unused. As we did that work, market conditions deteriorated. We ultimately saw no viable path to deliver the approved scheme at a revenue that could support its cost. Current application is our response, multifamily rental housing and ground-oriented duplex housing that we believe there is genuine market demand to support. Because we were giving up substantial density, the project economics no longer support the in-kind child care facility and below-market housing that were tied to the larger CD1 proposal. However, the revised proposal still conveys a parcel of green space to the city for a future park at the corner of Laurel and 19th Avenue. Perhaps most importantly, tenant protections and eligibility remain unchanged in this new application. Every eligible household retains the same benefits as under the prior proposal, including the right to return to the new building, their existing rents, financial compensation, and coverage of moving expenses. Tenant eligibility has been determined in collaboration with and confirmed by housing staff. During the previous public hearings, some tenants expressed that communication from West Group had been inadequate. Although staff confirmed that we had met and exceeded the communication requirements of the tenant relocation and protection policy, we sought to improve our communication with tenants. We held two in-person meetings at Hillcrest Community Center, one in November 2022 and one in May 2024, attended by members of the tenants group, senior housing staff, and our team. Based on feedback that we received at the November 2022 meeting, we began issuing regular project updates to eligible tenants. Since 2022, we have issued 12 written letters advising those tenants of the status of redevelopment efforts. We also retained a new independent tenant relocation consultant, Shauna C. Luke, who I believe is on the call. Every eligible household has been contacted individually and offered ongoing relocation planning and housing search support. Eligible tenants have been advised that relocation is not required at this time as no notices to end tenancy have been issued. And throughout, we have maintained transparent communication about the project status, timeline changes, and current market conditions.
Just to summarize and close, West Group acquired this property in 2015 with the intention of developing duplexes. We were advised that an application would not be accepted at that time due to the Canby Corridor Phase 3 planning program, which did not complete until May 2018. From there, we advanced through the full rezoning process, including a letter of inquiry process, ultimately securing not only approval in principle, but also enactment, only for market conditions to shift before we could proceed. Current application offers a realistic, deliverable path forward, less density, housing that fits the neighborhood, a future city park, and all tenant protections remain fully intact. For these reasons, we respectfully urge Council to approve the application. I'd be pleased to answer any questions, and also I'd like to thank rezoning staff for their excellent work on this application. Thank you.
Thank you very much. Council, you have up to five minutes to ask questions of team members and the applicant. Councillor Meiszner.
Yeah, thanks. First question is for the applicant around the park. I noted the park has been reduced in size. I'm just curious as to why you want to position it on the corner of Laurel and 19th as opposed to maybe somewhere in the middle of the site.
Yeah, the reason for that is because that was the previous location of the park, which was consistent with the Canby Corridor Plan. In the unique site section of the Canby Corridor Plan for the site, it contemplated either a linear park going through the middle of the site, which will now have a city lane, or the corner of Laurel and 19th. So that was really the rationale for that.
Okay. And the linear park previously contemplated, was that larger than this parcel?
We didn't proceed with the linear park. We had initially proposed a linear park through the middle of the site. At urban design panel, they asked us to do the corner park instead. The Canby quarter plan contemplated sort of one or the other. Okay. And so, yeah, we did not propose a linear park in the previous application.
Okay. Thanks for that. I think Josh is going to provide more info.
I JUST WANT TO ADD MORE COLOR ON THE LOCATION OF THE PARK. IN CONVERSATION WITH PARK STAFF ALSO WE DID TALK ABOUT THOSE DIFFERENT OPTIONS WITH THE PARK. ONE OF THE BENEFITS OF IT BEING ON THE CORNER ADJACENT TO THE STREET IS THAT FUNCTIONALLY IN DESIGN THEY CAN COMBINE THE PRIVATE PARCEL WITH THE BOULEVARD SPACE TO EXPAND THE FUNCTIONAL USE. of that park space. And so that's, that's why we ultimately landed on that corner location.
Okay. So it kind of makes it seem bigger or it is bigger because it'll have the sidewalk area. Correct. Okay. Okay. Thanks for that. Appreciate that. And then my other question was for, I guess, probably the applicant as well. What's a front and back duplex? I don't know what that is. Is that a multiplex? Is that a four?
No, it's a duplex. So we'll have two units.
Okay.
The access just basically divided in half so that one has the front yard and one has the backyard. So just a sort of traditional duplex that you would see on a 33-foot lot.
Okay. And what's the square footage of these units?
It's 0.7 of roughly 4,030 square feet, which the mental math I'm not great at.
Like under 2,000 square feet? Yeah.
Per unit?
Yeah.
Yes.
So larger, larger family size. Three bedroom units. Yeah. Okay. Okay. That's it for me. Thank you. Thank you. Uh, counselor or.
Yeah, definitely have some concerns around the loss of BMR and the tenants that won't be eligible. So obviously some tenants have moved in since 2021. That's a long time, five years. Is there nothing that is, or maybe is it part of the TRPP review in terms of some sort of... thing where this is re-triggering like a review of the tenants. If nothing is done in five years, these people now are part of the neighborhood, part of the community, feel close to their neighbors and now won't get any of those protections. Is there anything in the TRPP review that is going to address this?
Thank you, Councillor, for the question. We will relay that question to our housing team to answer.
Councillor Dan Garrison, Director of Housing Policy and Regulation. I mean, certainly one of the key points of our long-term review for the TRPB is going to be to look at anywhere there are gaps in support and consider whether there are ways to fill those gaps. So that's certainly something we would be looking at.
Okay, that's good to know, but I guess that doesn't give these people any sort of comfort.
Yeah, it would be difficult to retroactively apply it to an existing application.
I'm glad that it's going to be looked at in the future. Do we know how staff are communicating with those tenants in terms of what the process looks like?
For people who may find this relocation very difficult, even if they don't comply with the TRPP, are we still in contact with them? Are we still talking to them about their options?
Thank you, Councillor, for the question. I'm Mel Norton, Housing Policy and Regulation. City staff have responded to questions from tenants through Shape Your City and through email and telephone. The applicant has been providing regular updates to tenants, quarterly updates, and key project milestones. Okay.
And then this is kind of probably a difficult question to answer on the spot, but I mean, what percentage of new rental units would be affordable to households earning Vancouver's median renter income?
That's a good question. Can I get back to you on that one?
Yeah, for sure. Okay. Yeah. Yeah, a question about the childcare facility. Is it just sort of being completely dropped or is there any sort of replacement site being looked at or, you know, something through the CAC, anything like that? Is it just gone?
Thank you for the question, if I understood that correctly. So if council were to consider this proposal and approve it, and if the applicant were to move forward with enactment, the daycare would no longer be at this location. We'd have to look for other locations within the Canby corridor to locate an additional daycare.
That's unfortunate.
Again, so, yeah, some questions on the park. It shrunk from 566 to 374. I know Councillor Meiszner asked some questions around that. So that means it still meets the ODP's intent. And then also as a follow-up question, if the park board was consulted in sort of losing park space.
Seeing nods.
Thank you for the question. Real quick and short answer is, yes, we do believe it's consistent with the intent of the ODP to locate a park at this location with some of that minor flexibility. We wanted to make sure the public was aware of that, so we consulted on that through the process, too, and it's reflected in the report. We did work very closely with park board staff. I don't believe park board staff are here at this meeting today, but I do understand that they did coordinate internally at parks as well.
Okay. Again, just sort of around the process of how this is sort of referred, rather than being, you know, like a public hearing, you know, this is not consistent with the Canby Corridor plans below market target. The park and childcare commitments as well aren't being carried forward.
Why is this being recommended as approved in principle? and not, you know, either refer to a public hearing or even like sort of, you know, further revisions back to staff?
Thank you for the question. So in terms of whether or not there's a public hearing, the test is compliance with the official development plan. So lower densities are permitted in the low-rise designation. So from a use perspective, it's compliant. I'm sorry, we're out of time. Thank you. But Councillor Maloney?
I'm very happy for you to complete that question.
Thank you very much. So just to conclude as well, so if it's consistent with the ODP and predominantly residential, we're prohibited from having a public hearing, which is why we're in this forum today. Despite the CAMBI plan seeking to have both low and mid-rise options on the site, that is policy kind of guidance direction for the unique site, but we're here today to consider the alternative proposed by the applicant too.
Thanks. And I'd like to ask, A couple of questions of the applicant. Obviously the loss of the below market housing and the childcare and the density is very disappointing. Was there thoughts towards selling the site and how possible was that?
selling the site for another group to execute on the previous CD1. I suppose there was some thought of it, but our belief was that if a group like ourselves with the expertise and capability to execute a project like that found that it was not viable, it was very unlikely that another group was going to come to a different conclusion.
Thanks. That's very helpful. And with these changes, is it likely that the project, as the revised project, will proceed any time soon?
Yes, we believe so, and we've been developing development permit drawings for the first phase of duplexes and the rental building with the intention of submitting those soon after this if the application is approved. Thanks. Thanks very much.
Yeah, thanks very much. I just wanted to verify reading through related to the tenants, and this is for the applicant. It seems to me that with the 2022 rezoning approval, tenants came in, and my assumption, Evan, is that they sort of knew that it was an act of rezoning, and then there would be... potentially a future rezoning. So as opposed to, I guess, how transparent with you were you with those tenants when they took occupancy that they knew that there was an active rezoning?
Yeah, I appreciate that question. They were certainly aware of it. And in fact, their tenancy agreement included an addendum that explicitly and specifically identified it as a redevelopment site, which they acknowledged. It also included an acknowledgement that the rent that they're being charged is less than what it would be at market in recognition of the fact that it's a redevelopment site.
Well, that was going to be my second question. So thank you for answering that. And they have the ability to move back in. As part of the phasing, it looks like there's an opportunity for tenants to sort of move back in or sort of the disruption to the tenants is less because of the phasing approach.
That's correct, yes. And there's a condition housing staff can speak to about providing a tenant disruption plan as well. In other words, a plan to minimize disruption to tenants.
Okay. The lots two through nine, can you just clarify, will they all be fee simple? Yes.
And the rental will be in lot one, the RR2B? Correct. Yeah. recognizing that the proposed park is a community benefit. How did you decide, or how was it, and maybe staff will want to comment on this, just the trade-off with the child care, the opportunity with child care, given that there are parks close by. I just wonder, did it come down to the mathematics of the deal itself? You know, yeah, I'd just like to better understand, because child care, of course, especially with family-oriented units like this, would just be an absolute game-changer, I would suggest. And so I'm disappointed to see that it's not continuing, but I'd like to understand more as to why.
Yeah, so I guess to... put it briefly, the project economics just couldn't support it. So there was not enough lift to support delivering a childcare. The park we were able to do, there's obviously a land exchange, which Oscar alluded to where, you know, our site will be gaining a portion of the South, like a seven foot strip along the South portion of the property line in exchange for that, that park area.
Okay. Can I hear from staff as well in terms of how council can support continue to focus and target for childcare and what would have been required on this site. Hypothetically, we can, I'm okay to sort of speak in general terms, but I just want to understand because, yeah, there's a trade-off here and it's a decision to be made. And we do have the ability to ask for childcare, but we just need to know what the ask would actually be.
Thank you for the question. So again, the application before us doesn't include it. The previous one that enacted did. Our review supported the applicant's points just made that there isn't enough lift to compel it through a CAC process, which is our typical way of securing an in-kind amenity on a project. So in the absence of that, the only other alternatives are to look through other partnerships, other land opportunities, other co-location opportunities, and look to our PBS public benefit strategy within the Canby plan to find other options that might be within the geographic area. But it isn't currently proposed within this project.
Okay. All right. I'll leave it there. Thanks.
Thank you very much. Okay. Would someone like to move the motion?
Councillor Claassen, thank you. Councillor Domonato seconded. Council, is there any discussion?
Councillor Bligh?
Yeah, thanks very much. I appreciate the process that has been undertaken by our staff and the applicant over many years to get to this point. I'll just speak... Very briefly on it. I think it's the kind of density that we are looking for in this area, dental density, as well as the rental opportunity on the RR2B lot or lot one with the RR2B. I'm going to support this. I think that the tenant disruption is definitely worthy of consideration. I do feel comfortable that there has been enough done at this point, and I hope that through the phasing, the tenant's disruption will be managed. You know, I don't think it can be understated. We know that our city... is lacking rental housing. We know that increasing rental housing allows tenants to have more options. At this time in 2022, there wasn't a lot of rental housing. There is a lot more now, but it's whether or not it's affordable. And so I can appreciate that the tenants themselves here likely had to make their own personal decision about whether or not to take less expensive rent. more deeper affordability with a shorter term window in terms of how long they would be able to stay there and those conversations and considerations I think are individual choices and circumstances so that I think is a considerable difference we talked about a project yesterday that had massive tenant disruption with no heads up and it's a very different situation so I feel comfortable supporting this, but I'll just say for the record that I think that we need to be figuring out how to make sure that there is enough lift to deliver child care. We just are going to suffer greatly in our city if we continue to increase housing without an accommodation for some sort of child care and where the opportunity comes. is in partnering with the province to deliver $10 a day childcare. And the more spaces we have available for publicly supported childcare as opposed to privately owned and operated, then we have a plan in place. And again, I think that there's a strong economic imperative to provide affordable childcare and the long-term vision for our city. So I'll continue to raise that should I continue to get the chance. So I am happy to support this project today and I appreciate the work that's gone into making it happen and recognizing that tenants need to be supported as human beings, families that are dealing with disruption. And I ask and trust that that will be the approach that's taken. So I'm happy to support this today. Thanks.
Thanks, Mayor. I do think that we don't often get a proposal that comes forward that asks for reduced density, but I will say what I do like about this proposal, it's refreshing, I think, for people to see a mix of tenures on the site and a mix of building forms. And I think that makes for an interesting city, and I think it's what people are looking for in addition to sort of tower fatigue, if I can call it that, to be able to see... some diverse choices and some ground-oriented housing, and it's great to have sort of rental and ownership options alongside. I actually do really support the fact that the public amenity that was retained was the park. in terms of the green space because, and while it may be a bit smaller, I think it's really important that people have room to breathe in an increasingly densifying city. And we hear that a lot. And so, yes, we need larger sort of parks that do a lot of hard work. And, you know, you have your larger ones where people can go and... Play ball and do other things but sometimes I just want a quiet space to kind of take a break could take a minute and having those sort of smaller footprint or pocket parks Are very much valued. There's another one not too far from here that the city had advanced as well In conjunction with a bike lane and it used to be a single-family home and these things are loved and used in the respective neighborhoods So for me, I think that's an important one. That's the one amenity that the city can on our own. I think we have refocused our childcare policy in terms of looking at what the city can enable realistically within the economic constraints. And we've done a lot, this council, in terms of advancing that and moving regulations forward. But we also recognize that we need to focus on sort of a lot of the livability issues and the key amenities and neighborhoods. So I think for me that this landed on the right amenity. I'm really happy to see that piece. And I do appreciate the clarity that the tenants that have moved in have done so with eyes wide open in terms of sort of choosing that particular living situation at that point in time. So, yeah, I'm happy to support it, and I appreciate staff walking through it. Thanks.
Yeah, thanks very much. Just a few brief comments here. So, you know, we realize that this project has come back and there has had some, I think, some practical decisions needed to be made. And as Councillor Corbett-Young says, the mix of building forms, I think, will really lend itself very well to this area. I actually really love the fact that the park will be along Laurel Street and 19th. The first home my wife and I purchased was about two blocks away from here. I remember when our daughter was first born, she was a little cranky. We had to do late night walks with the baby stroller around Douglas Park and it would be down Laurel Street. And it was a nice leisurely stroll down there. And always, I think that this will be a really great fit for this area. You know, we're talking about building stock there that is about three quarters of a century old. So it was time for some renewal there. There has been attention to tenant displacement, which I think is obviously non-negotiable for this council. And I also wanted to just note that this is quite close to the expanding Vancouver General Hospital campus. And we know that Housing for all workers at that facility will be really important, including a lot of the service staff that I think would probably find a great place to live and potentially raise a family there. So anyway, just look forward to seeing this move forward, and I think it's a great fit for this neighborhood. Thanks very much. Thank you, Councillor Orr.
Yeah, thanks. I was just wondering if staff had an answer on the question around if, yeah, for median income, if they can afford the market rental units in this building.
Yes, thank you for the opportunity to look into your question, Councillor Mel Norton, Housing Policy and Regulation. So based on 2025 rental data, average market rents in the west side of the city where the site's located are between $2,000 for a studio and up to $4,800 for a three-bedroom unit. This serves incomes between approximately $80,000 to $195,000 gross household income. Median renter household incomes based on 2021 census data citywide are between $40,000 for individuals to $162,000 for families. I will also note that eligible tenants have the right to return other existing rents.
Yeah, it is persuasive to me that... we face a choice of having a variety of low-rise family housing or no housing at all here, realistically. And it is extremely disappointing to lose the childcare. And the reality appears to be that no matter how we vote on this, there is no possibility of childcare and the city needs to do everything it can to make sure that we... facilitating as much childcare as possible because there's a desperate need. Unfortunately, this is so disappointing because the principal way we get new childcare spaces for families in Vancouver is through new developments. So this is a real blow, but I'm going to support it because I do want to see family housing built on this site rather than no development at all. And that's a choice that we face here.
Statement Watch
My name is Oscar Erickson, and I'm the rezoning planner for this rezoning application at 906 to 982 West 18th Avenue, 907 to 975 West 19th Avenue, and 3403 to 3415 Laurel Street, also known as the Balfour Block. The site shown in red is located just east of Oak Street, between Laurel Street, 18th and 19th Avenues. The surrounding neighborhood consists of single detached houses and to the west, low-rise rental buildings along Oak Street. The site is located 900 meters south of the future Oak VGH SkyTrain station and is currently occupied by 17 rental duplexes constructed in the 1950s. There are tenants on site eligible for protection under the Tenant Relocation and Protection Policy. Land use and height are consistent with the residential low-rise generalized land use designation of the Vancouver Official Development Plan. This designation supports a range of residential tenures up to six stories. The southeast corner of the site is proposed as public open space and is consistent with the park and open space designation of the ODP. The site is located within the Canby Corridor plan area and is identified as a unique site. The plan anticipates a mix of townhouses, low-rise and lower mid-rise buildings with 25% of the net new rental floor area to be below market rental units. It also calls for integrated public open space and seeks to secure a childcare facility on the site. While the site does meet the site's threshold for the rezoning policy for sustainable large developments, given the project is seeking to rezone to lower density through district schedules, there are limited opportunities to land this policy on the site. Staff worked with the applicant to ensure the delivery of rental housing and the retention of the park at the southeast corner, in part responding to the objectives of the city's policies. TO PROVIDE SOME BACKGROUND, THIS REZONING APPLICATION FOLLOWS A PREVIOUSLY APPROVED CD1 REZONING APPROVED AT PUBLIC HEARING IN 2022 AND ENACTED IN 2024. THE 2022 APPROVAL CHANGED THE ZONING FROM RESIDENTIAL RT2 TO CD1 AND INCLUDED A COMPREHENSIVE PROPOSAL WITH 51 STRATA UNITS, 58 STRATA TITLED TOWN HOMES AND 99 RENTAL UNITS, INCLUDING 25 UNITS OF BELOW MARKET HOUSING. THE PROPOSAL ALSO SECURED A 570 SQUARE METER PUBLIC PARK AND A 37 SPACE CHILD CARE FACILITY. THE REZONING APPLICATION BEFORE COUNCIL TODAY SEEKS TO REVISIT THE 2022 REZONING AND ITS SUBSEQUENT ENACTMENT. The applicant has indicated that due to changing market conditions, the existing zoning with its secured public benefits is no longer economically feasible. The applicant is now seeking an alternative way to move the project forward and has identified this proposal as a viable option. Should the current proposal be approved by Council, previously secured public benefits such as the childcare facility and below-market rental housing will be foregone. The applicant is proposing to subdivide the site and rezone to standard zoning districts. Lot 1, here shown in yellow, would be rezoned to our R2B district, allowing for a six-story rental building. And lots 2 to 20, here shown in purple, would be rezoned to R11, each permitting a four-unit multiplex development under fee-simple ownership. PARCEL AT THE SOUTHEAST CORNER OF THE SITE WILL BE CONVEYED TO THE CITY FOR USE AS A PUBLIC PARK. THIS PARCEL WILL BE REZONED TO A CITY ONE DISTRICT LIMITED TO PARK USE. staff note that the park secured under the previous proposal was larger at 570 square meter compared to the park parcel secured under this proposal at 375 square meters. As the enactment of the 2022 rezoning reflected the park commitment in the ODP, staff also note that although this park is smaller than illustrated in the ODP, it still meets the intent of securing a public park on the site. Administratively, the city will undertake a land exchange. The city frontage lands, being a city-owned seven-foot-wide frontage strip along 19th Avenue, shown in the diagram within a purple dashed line, will be exchanged for the park parcel. A service lane is required for the planned multiplex developments, and the lane will be secured through a dedication. Architectural drawings are not submitted for a standard district rezoning. Instead, the form of development is reviewed at the development permit stage. The RR2B and R11 district schedules set out the expectations for the built form that can be anticipated. In order to facilitate the earlier delivery of the RR2B rental building and lane, and to minimize disruption to tenants, the rezoning process will occur in two phases. In Phase 1, the developer will develop the land north of the lane. Once the Stage 1 building permit for the RR2B rental building is issued and all other associated conditions are satisfied, the developer can proceed to Phase 2, which includes conveyance of the park to the city and development of the lot south of the lanes. To conclude the process, the current City 1-884 will be repealed together with the public benefits secured at that time. A virtual Q&A period was held, and in total, 88 pieces of correspondence were received. Support was expressed for the addition to the housing stock, the proposal's improved neighborhood fit, the proposed lower density, and the housing options that the proposal offers. Concern was expressed for tenant displacement, the loss of the previously secured public benefits, building height, and impact to neighborhood character. In response, staff note that the applicant is required to provide tenant compensation based on length of tenancy, support finding interim housing, and their right to return to the new rental building at existing rents. Further, the proposed rezoning would result in a lower overall density compared to the previous proposal. While this change results in a reduction of the previously secured public benefit, it continues to secure a public park for the community. The proposed six-story rental building will comply with the RR2B district schedule. This zoning framework was created through a comprehensive citywide policy process designed specifically to guide the development of new rental housing across Vancouver, ensuring consistency, predictability, and compatibility with the city's broader housing goals. I also note that the anticipated form of development under this proposal reflects a reduction in density, thereby providing a smoother and more compatible transition to the surrounding single detached houses in the immediate area. With the application approved, the project is expected to provide a total of 2.7 million in DCL contributions. It would also deliver approximately 90 market rental units and secure a public park. In conclusion, this proposal is consistent with the ODP and delivers the replacement rental housing and public park identified in the Canby corridor plan. However, it falls short in delivering a childcare facility and the below market housing component originally anticipated. Staff have worked closely with the applicant to arrive at the viable proposal and while recognizing the reduction in public benefits are bringing this application forward for council's consideration. Staff recommend approval subject to conditions outlined in Appendix B. Staff and the applicant team are available to respond to any questions. Thank you.
Statement Watch
Good morning, Mayor and Council. My name is Evan Lewis. I'm Senior Director of Development with West Group Properties. As you heard, we were asking for council to approve a reduction in density to this site. The application voluntarily reduced the allowable density by approximately 80,000 square feet, a reduction of roughly 40%. In its place, we envision a 95-unit rental building under RR2B, together with 20 front and back duplexes under R11 zoning. This form is consistent with the official development plan and, importantly, is highly consistent with the character and scale of the surrounding neighborhood. This decision was not made lightly. Following approval of the previous higher density rezoning, West Group made good faith efforts at significant cost to advance that scheme. We developed and submitted development permit and building permit drawings for all phases, paid the associated fees, and advanced the process to the point that many of those permits were issuable. We even leased out, built out, and furnished a nearby sales center, which is currently sitting unused. As we did that work, market conditions deteriorated. We ultimately saw no viable path to deliver the approved scheme at a revenue that could support its cost. Current application is our response, multifamily rental housing and ground-oriented duplex housing that we believe there is genuine market demand to support. Because we were giving up substantial density, the project economics no longer support the in-kind child care facility and below-market housing that were tied to the larger CD1 proposal. However, the revised proposal still conveys a parcel of green space to the city for a future park at the corner of Laurel and 19th Avenue. Perhaps most importantly, tenant protections and eligibility remain unchanged in this new application. Every eligible household retains the same benefits as under the prior proposal, including the right to return to the new building, their existing rents, financial compensation, and coverage of moving expenses. Tenant eligibility has been determined in collaboration with and confirmed by housing staff. During the previous public hearings, some tenants expressed that communication from West Group had been inadequate. Although staff confirmed that we had met and exceeded the communication requirements of the tenant relocation and protection policy, we sought to improve our communication with tenants. We held two in-person meetings at Hillcrest Community Center, one in November 2022 and one in May 2024, attended by members of the tenants group, senior housing staff, and our team. Based on feedback that we received at the November 2022 meeting, we began issuing regular project updates to eligible tenants. Since 2022, we have issued 12 written letters advising those tenants of the status of redevelopment efforts. We also retained a new independent tenant relocation consultant, Shauna C. Luke, who I believe is on the call. Every eligible household has been contacted individually and offered ongoing relocation planning and housing search support. Eligible tenants have been advised that relocation is not required at this time as no notices to end tenancy have been issued. And throughout, we have maintained transparent communication about the project status, timeline changes, and current market conditions. Just to summarize and close, West Group acquired this property in 2015 with the intention of developing duplexes. We were advised that an application would not be accepted at that time due to the Canby Corridor Phase 3 planning program, which did not complete until May 2018. From there, we advanced through the full rezoning process, including a letter of inquiry process, ultimately securing not only approval in principle, but also enactment, only for market conditions to shift before we could proceed. Current application offers a realistic, deliverable path forward, less density, housing that fits the neighborhood, a future city park, and all tenant protections remain fully intact. For these reasons, we respectfully urge Council to approve the application. I'd be pleased to answer any questions, and also I'd like to thank rezoning staff for their excellent work on this application. Thank you.