940-950 West 41st Avenue ODP and CD-1 Amendment

Motion 1 · Public Hearing, July 16, 2026

Carried Location 940-950 West 41st Avenue Moved by Sarah Kirby-Yung, Lisa Dominato Watch recording

Summary

  • The Jewish Community Centre (JCC) at 940–950 West 41st Avenue is proposing a major redevelopment of its campus, replacing the current three-storey building and surface parking with a four-phase development.
  • The proposal includes two towers of 39 and 37 storeys (up to 136 m / 446 ft.), two six-storey buildings, 630 market rental units (with at least 20% of residential floor area secured as non-profit operated rental housing), a private childcare, a private school, and a replacement JCC.
  • The application requires amendments to both the Vancouver Official Development Plan (ODP) — changing land use designations from Mixed-Use Mid-Rise/High-Rise 1 to Mixed-Use Low-Rise/High-Rise 2 — and the existing CD-1 (285) zoning, increasing maximum FSR from 4.49 to 5.77.
  • A previous 2018 rezoning approval had permitted shorter towers (26 and 24 storeys) with 299 social housing units; that plan was enacted in September 2025 to allow JCC construction to proceed, but the applicant withdrew the social housing component due to viability concerns and submitted this revised proposal.
  • The proposed heights exceed the current ODP height range, triggering a mandatory Public Hearing under the Vancouver Charter.
  • The General Manager of Planning, Urban Design and Sustainability recommends approval in principle, subject to conditions including a Housing Agreement to secure the affordable rental component.

Report Images

Vote

Public comments

👍 In support 💬 Neutral / information
Read all 6 statements
Diego Mandelbaum Corex · Chief Development Officer support

Statement Watch

Thank you.

I need your name and whether you live in the city of Vancouver.

My name is Diego Matlabom. I live in North Vancouver, but I work in the city of Vancouver. Okay, thank you.

Go right ahead.

Thank you, everybody, for your time. I want to voice my very strong support for this project, both as what I would consider myself a proud Vancouverite, a proud member of the Jewish community. But the reason I support this project beyond all of the social benefit that I think we've heard here today is because there's no better community center than one with community energy. And there's an infrastructure story here that this project can help unlock that people might not be very familiar with. So I'm the chief development officer of a company called Corex. We develop, invest, and own district energy systems, low-carbon ones, regulated by BC Utilities Commission. And when Oak Ridge Park down the road was first being conceptualized back in 2015, 2017, that was a long time ago, there was the new green building policy that was coming out, and it was envisioned that Oak Ridge Park would be the anchor for a new low-carbon district energy system that would provide low-carbon energy for all of the Canby Corridor and the Oak Ridge area. Very proud to say that we've developed that system. We're a 50% owner of that system. So Oak Ridge Park actually has about 500 geothermal boreholes underneath and it heats and cools that entire development. But the intention is to turn that into a true broader community asset that can serve the community around there and to expand that infrastructure so it gets beyond Oak Ridge Park. The Jewish Community Center would be the first potential expansion customer for that infrastructure. And what that unlocks is not just benefits for the Jewish Community Center to be sustainable, reliable, and low carbon, but it actually then unlocks piping in the street that can then serve all of the developments around there. So whether it's Oak Ridge Transit Center or the other things that are coming down the pipeline, no pun intended, we then have the ability to serve them through the district energy system. And if we miss the opportunity with the Jewish Community Center, it's a very real possibility that that beautiful district energy system under Oak Ridge Park remains only to the servitude of Oak Ridge Park, and that would be a real tragedy. And so as you consider this, please consider the infrastructure and sustainability and climate action that can be accomplished by having the Jewish Community Center project go forward. That's why I would like to voice my strong support for the project. Thank you.

Simon Jay City of Vancouver Planning, Urban Design, and Sustainability · Rezoning Planner

Statement Watch

Good evening, Acting Mayor and Council. My name is Simon Jay, and I'm the rezoning planner for this rezoning application for the Jewish Community Center, or JCC, at 490 to 590 West 41st Avenue. Staff would like to note that there is a yellow memo attached to this project that provides additional information about the ODP amendment, as well as information on a change of ownership since the report was referred. The site outlined in red is an irregular shaped 1.35 hectare or 3.3 acre parcel located on the south side of 41st Avenue to the west of Willow Street. It is currently developed with the three-story Jewish Community Center and a surface parking lot. The surrounding area is undergoing significant change. The Oak Ridge Center is currently being built and is a multi-tower development with heights up to 52 stories. TO THE NORTH OF THE OKRID CENTER IS THE APPROVED R51 ZONING ALLOWING MULTIPLE TOWERS UP TO 26 STORIES. THERE ARE ALSO TWO ACTIVE REZONING APPLICATIONS ACROSS THE STREET FROM JCC. THE FORMER OKRID TRANSIT CENTER WHICH IS PROPOSING MULTIPLE TOWERS UP TO 33 STORIES AND 809 WEST 41ST AVENUE WHICH IS NEXT UP ON TONIGHT'S PUBLIC HEARING AGENDA AND PROPOSES 32 STORY TOWER. Under the Vancouver Official Development Plan, this site is currently split designated as Mixed Use Mid-Rise and Mixed Use High-Rise 1. An amendment to the ODP to change the designation is required to support this proposal. The change is to Mixed Use High-Rise 2 and Mixed Use Low-Rise. This proposal is being considered under the Oak Ridge Transit Center and adjacent sites policy statement. The policy statement provides direction for renewal and expansion of JCC. It includes guidance on mix of use, built form, and public ground improvements. It says building height should be respectful of the existing and future neighborhood context, but no maximum density is provided. IN 2018, COUNCIL APPROVED A RESONING AMENDMENT FOR THE JCC CAMPUS. THIS INCLUDES A LARGER JCC AND RESIDENTIAL TOWERS OF 26 AND 24 STORIES. THE 2018 APPROVAL WAS ENACTED IN 2025 AND IS THEREFORE ALLOWABLE UNDER THE CURRENT CD1 ZONING. THE PROPOSAL BEFORE YOU TODAY AMENDS THIS CD1, CD1 285, FOR A FOUR PHASE DEVELOPMENT. It includes two towers with heights of 39 storeys, which is 136 metres tall, and 37 storeys, which is 131 metres tall. The overall density proposed is 5.77 FSR. The application proposes 630 rental units, of which 20% of the residential floor area will be secured as non-profit operated. IT ALSO PROPOSES A 16,000 SQUARE METER TOURIST COMMUNITY CENTER, A PRIVATE CHILDCARE AND A PRIVATE HIGH SCHOOL. UNDER THE VANCOUVER CHARTER, CONSULTATION AND OPPORTUNITIES MUST BE PROVIDED FOR PERSONS, ORGANIZATIONS AND AUTHORITIES AFFECTED BY AN ODP AMENDMENT. Council directed staff to consult with the VSB, CSF, the Musqueam Indian Band, Squamish Nation and TTsleil-Waututh Nation. The VSB noted there are capacity shortages anticipated at the catchment scores, Jamieson Elementary and Hamburg Secondary. The VSB employs several strategies to mitigate enrollment pressures, including reducing out-of-catchment enrollment, relocating districts' choice programs, adjusting catchment boundaries, undertaking renovations, and deploying portables. No comments were received from other groups by the end of the consultation period. During the public engagement period for this resounding application, support was expressed for this community-led and financed development, that it provides expanded community amenities, it continues the legacy of the existing JCC, increases rental housing, and it's in a good location served by transit. Concerns were related to construction fatigue, traffic and parking, tower height and neighborhood fit, infrastructure strain, and insufficient affordability. staff have the following responses to these concerns. Staff acknowledge the high level of construction in the area and that construction will continue for the foreseeable future. However, staff note that the most disruptive construction on 41st Avenue has mostly finished and the majority of future construction should be less concentrated. Also, the development must follow city processes and permits, including meeting the noise control bylaw. THE SITE IS WELL SERVED BY TRANSIT AND IT IS NOT ANTICIPATED THAT THIS PROJECT WILL SIGNIFICANTLY INCREASE TRAFFIC OR STREET PARKING. THE NEIGHBORHOOD IS CURRENTLY CHANGING TOWARDS A HIGH RISE TRANSIT ORIENTED AREA AND THE HEIGHT AND DENSITY OF THIS PROPOSAL FITS WITH THE EMERGING CONTEXT. AS PART OF THE REDEVELOPMENT, JCC WILL PROVIDE EXPANDED COMMUNITY FACILITIES. Staff have worked with the applicant to increase long-term affordability and have secured at least 20% of the residential floor area to be operated by a housing non-profit. The anticipated public benefits from this project is $19 million, which is approximately $17.7 million in DCLs and $1.3 million in public art. OTHER PUBLIC BENEFITS INCLUDE APPROXIMATELY 16,000 SQUARE METER REPLACEMENT JEWISH COMMUNITY CENTER, 99 PRIVATE CHILDCARE SPACES AND 630 RENTAL HOUSING UNITS OF WHICH 20% OF THE RESIDENTIAL FLOOR AREA WILL BE SECURED AS NON-PROFIT OPERATED. THE PROPOSED LAND USE FORM OF DEVELOPMENT AND THE PUBLIC BENEFITS ARE GENERALLY CONSISTENT WITH THE INTENT OF THE OTC POLICY STATEMENT. STAFF SUPPORT THIS APPLICATION SUBJECT TO CONDITIONS CONTAINED IN THE REPORT. STAFF AND THE APPLICANT TEAM ARE AVAILABLE TO ANSWER QUESTIONS. THANK YOU.

Ezra Shank Jewish Federation of British Columbia · Chief Executive Officer

Statement Watch

Oh, yeah, look at that. No, no, it's all good. Great. Okay. My name is Ezra Shank, and I am the chief executive officer of the Jewish Federation of British Columbia. And after 10 years of working on this, I think I'm in support of it. I think that, you know, it's a good thing. For generations, The Jewish Community Center campus has been a place where people came together to learn, connect, celebrate, and support one another. It serves not only the Jewish community, but thousands of Vancouver residents from every background who participate in its programs. access its services, and benefit from its cultural and recreational offerings. The proposal before you is about securing that future. I think it's really important to touch on the fact that this is a nonprofit project. The housing component makes it possible to the renewal of critical community infrastructure. Together, the residential and community elements create a sustainable model that helps address housing needs while preserving essential public services and amenities. I also want to acknowledge that this project, like this, do not happen in a vacuum. Many in our community have felt at times they've felt hurt by rhetoric that has questioned our experiences, dismissed our concerns, or made us feel less welcome in civic life and of this city. Yet we are not here tonight to dwell on division. We are here to build. The Jewish community has never measured itself by the volume of its critics. We measure ourselves by what we contribute, what we create, and what we leave behind for future generations. Long after today's debates are forgotten, families will live here, families will learn here, seniors will gather here, and communities will connect here. That will be the legacy of J. West. And in a time when it's often easier to divide than to unite, we have chosen to invest in Vancouver, to strengthen Vancouver, and to help build Vancouver's future. I want to thank... The counselors in this room, so many of you have been along on this journey with us. I have a huge amount of gratitude for all of that. I take none of it for granted. I want to say for the counselors who were here at the beginning who are no longer here, I want to thank them too, who took us every step of the way and for the incredible planning department who has worked side by side with our incredible team here. And with that, I respectfully ask for your support of this transformational project at a transformational time.

Allison Jewish Community Centre · Assistant Executive Director

Statement Watch

Thank you. Thank you for having me tonight. Thank you, councillors and acting mayor. So I consider myself incredibly fortunate to have the best job in the world. I've worked in community recreation for nearly 30 years. I am currently the assistant executive director at the Jewish Community Centre. And funny enough, before joining the JCC, I actually spent six years managing Trout Lake Community Centre. Because I've worked on both sides of recreation, I can say with confidence that the Jewish Community Center is one of Vancouver's hidden gems. And I'm here today to speak on behalf of strong support for J-West. For nearly 100 years, the JCC has strengthened this city by complementing Vancouver's recreation system. Every day, we provide recreation, childcare, arts, health, and community programs that help meet the growing demand without relying on municipal operating budgets. Walk through our doors on any given day. You'll find 150 kids in camp, 80 families in our daycare, a room full of older adults playing bridge, packed fitness classes, packed pickleball classes, a full theater, and neighbors gathering around the cafe. Every year, we teach more than 3,000 swimming lessons and have trained 1,500 lifeguards, many of whom are keeping Vancouver residents safe in city pools. Our impact reaches well beyond our walls. Our early childhood center helps train the next generation of educators through partnerships with Langara and Vancouver Community College. While our theater provides hands-on experience for emerging theater technicians at a time when opportunities are becoming increasingly rare in Vancouver. But the magic of the JCC is not found in attendance numbers. It's found in the moments that you cannot measure. It's seeing someone arrive alone and leaving with lifelong friends. It's watching children from many cultures celebrating the Jewish Sabbath, together and learning respect, curiosity, belonging. It's seeing a community where approximately 40% of the people who walk through our doors are not Jewish, but feel just as welcome. As we rebuild the campus, we're not simply replacing a building. We're investing in the next 50 to 100 years, hopefully, of community and recreation in Vancouver. I've spent my career, my entire career in recreation. I know what municipal recreation does exceptionally well. I also know there's something truly unique about the JCC. We do not compete with the city's recreation system. We complete it. Thank you.

J-West Project · Co-chair

Statement Watch

I had a longer speech here, but, you know, really it's been covered quite well by Ezra and Allison. Thank you. Look, it has been an incredible journey for us. We've been at this for 12 years. And, you know, this team, we are ready. really, to get going on this project. And we hope you are too. Really, it could not have been made possible without some incredible work. I just want to name a few people out because it's really taken a lot of commitment and dedication and mostly collaborative work. And that's, I think, what's so exciting about this project is that we really, truly have come together as not just the Jewish community, but the larger community, planning department, the housing department, and yourselves, the councillors and mayor of the city. So just a special shout-out, because so much time was spent on this, to Josh and Donnie and Armin and Templer and the entire housing department and, of course, Simon. So we're ready to go, and we really appreciate all the time and the commitment in the process to get us to this point.

David Port J-West Project · Co-chair

Statement Watch

Thank you, Council, for the question. My name is David Port. I'm the co-chair with Joe of the J-West project. So this is a community project, community-led, community-run project. The housing will 100% remain owned by the community in perpetuity. So we will be working... with a housing provider on the affordability. What we see in the long term is quite different than a typical project and other projects might see in front of you. What we see in the long term is that we want to expand the affordability as far as we possibly can. However, on day one, we won't be able to because we'll just be getting started.

So will you be offering anything below market in those nonprofit-operated units to start with?

On day one or on day future?

On day one or let's say the first few years.

I don't know what day one will look like. Day one, we'll be working with a housing provider. And we'll let them govern the housing part of it, the nonprofit housing. And what we see over the fullness of time is we expect to well exceed that 20% as the cash flow allows and as we're able to.

But you have no projected timeline at this point for when you'll have some affordability?

We'll have affordability on day one. We have a requirement from our donor base that there's affordability on day one.

And how is that affordability defined, please?

We don't have a definition of it yet. We'll work with our housing providers. We'll probably be teak for housing to define that.

Okay. Thank you very much. I'm going to follow up on another question to staff. The previous proposal, I didn't find the presentation was explicit in the distinctions between it. It certainly did talk about building heights. We have 630 rental units now. What was the tenure of the units on the previously approved rezonings?

The tenure previously was social housing.

All of it?

I believe so.

299 units? Yes. Okay. And is it fair to say that the social housing can't be delivered without, because of the escalating construction costs and otherwise, without support from senior levels of government? Is that one of the reasons for the pivot?

My colleague Bill in real estate services can answer that question.

Or the applicant, maybe?

Yeah, she may be the applicant. I'm sorry.

If the applicant would like to comment on the pivot, that would be great.

Short answer, yes, economically not feasible to do that deep level of discount. But as well, an important component of this project is we want to see this project as self-sustaining. So we've got a community center, we have a school, and we have the housing. And in the fullness of the project, the project is to be economically self-sustaining. So the housing has to help us generate funding for the community center for the long term, pool replacement, roof replacement.

I understand, and I appreciate that. What changed between the previous approval and this one, that it wasn't sustainable?

Cost, yeah, massive, massive costing.

So escalation in construction costs?

Oh, massive, yeah.

Any other community amenity components that were added, or was it overall cost?

Were any community amenities added?

Were there any other material changes to the application?

The community center has always been a part of the application, so, I mean, that's clearly the community benefits, a $180 million community benefit.

Okay, but no other components changed?

Transcript

14 segments

So did we, clerk, did we receive any additional public comments since the close of public comment?

We have not.

Okay, very good. All right, I'll remind council that we need to move the recommendation for item one together with yellow memorandum dated July 10th, 2026. entitled Vancouver ODP Amendment and CD1-285 Amendment 940-950 West 41st Jewish Community Center Council Considerations When Amending an ODP and Change of Ownership. Council will now make its decision on this application. Do we have a mover and a seconder for this? Okay. Council Members, is there any further discussions? Okay. Councillor Kirby Young.

Yeah, thanks. I appreciated the presentation. It's an interesting one to have just after Council finished approving our four-year capital plan this afternoon. So it's sort of an interesting parallel with how challenging it is to deliver community infrastructure in the current cost environment. And this one is pretty significant in terms of utilizing and leveraging a site for multiple purposes, including delivering housing and partnering with the nonprofit to ensure some of those units provide what I anticipate and understand to be growing affordability over time but in conjunction with a rebuild of the community center that has a pool we have a shortage of those in the city I'm excited by the vision to daylight the Vancouver Holocaust Education Center and give it more prominence and additionally the childcare, and then I think integrating King David High School into sort of truly a community campus, if I can use that terminology. I think it's an exciting vision. I know that the community has been at this for some time. It has been a while. I've gone through a couple of text amendments, I think. You start to lose a bit of track, but it's been almost a decade, I think, since the early approvals, and that's a bit of a long haul. So I suspect that the community is excited and eager and anxious to get going on this one. I do think that it's going to provide a security of... a sense of roots and connections for the community. And the integrated nature of that is, I think, a really good vision. It is great to sort of see the opportunity to take care of people, whether it's people needing more affordability in the housing side, whether it's provision for seniors and kids, and when you can bring all those different uses together, I think that that is quite... something i do remember a lot of conversations in the early days as to why you do not build parking under community facilities like that which is sad that we have to contemplate that but it is an important consideration obviously specifically for this particular community so i am happy to support it it i did ask the questions earlier about the terminology because it is distinct and different than what we normally receive. But I also know the partners involved in this, both the organizations and the individuals associated with it. And I know that their purpose is very much driven by supporting community. And so I have trust in terms of the desire to support that affordability. And I actually have to say that I'm sure that there have been lots and lots of hours of meetings around financials and logistics in order to make this project work over time and how that works in terms of the phasing and levering that so there's a practicality obviously to doing the community center first there's a desire to rebuild that part first but that also financially places some very real impacts in terms of how the money actually close to move that forward so I'm I'm not I'm not unaware of those considerations but I do really appreciate the heavy lifting that has been done by everybody and also the partnership with staff and recognizing that this is a unique community organization that is trying to do good I think for its community but it's also quite frankly in my experience been very welcoming to all Vancouverites and to others outside of that. So I am pleased to lend my support to it, and I look forward to actually seeing something come to fruition. It will be an exciting day. Thank you.

Thanks very much. I'm just going to update the queue here, move to the main queue. Second queue.

Clerk 19:55:10

Okay. Councillor Meiszner.

Yeah, thank you. As my colleague, Councillor Kirby Young mentioned, long road, I'm sure. But I think, you know, it's resulted in a great outcome. And sometimes, you know, taking the long way can yield great results. So I think there's a lot of benefits to this development. I'll just list a few that I wrote down. 630 rental units, no displacement, amazing transit-friendly location, close to not just the... you know, revitalized and rebuilt amenities that are going to be on the site, like the JCC and the aquatic facilities and the high school and the Holocaust Education Center, but also all the great amenities at Oak Ridge Park that are close by that are going to be opening soon, including the library, the community center, the new public park on top of that shopping center. So I think this is a very appropriate development for the site and how that area is changing. And of course, the brand new JCC that's going to be built there as well. So I wholeheartedly support this project. And I'm very grateful that you're doing this and bringing it forward for the community and for all Vancouver A's. It's been mentioned several times tonight that everyone's welcome. And I know that to be true, as you've welcomed me many times. So I'm very much supportive of this. Thanks. Thanks, Councillor. Councillor Domenato.

Thank you, Chair. And thank you to the applicants and the JCCC and staff for all the work on this. I'm going to keep my comments brief because my colleagues have really touched on all the benefits that come from this project. Simply to say that I'm incredibly supportive. I also acknowledge it has been a long road. And at the end of the day, the JCC has been a real center for the Jewish community, but it also has been a center for the broader residents of Vancouver, and it will continue to do so into the future. And so it really is a win-win. And so I'm going to leave my comments there in the interest of time. We have a very long night ahead of us, but very pleased to see this come forward and happy to support it.

Thank you, Councillor. Councillor Zhou. Yeah, thanks, Chair. Also, 100% support this amazing project. I think in the past four years, we had multiple conversations about this project. Finally, to see this application come to Council at the end of the Council is really fantastic. Yeah, so also, I think it's more than just housing. It's about ensuring one of Vancouver's most important community institutions can continue serving the generations to come. The Jewish community, as we all know, is a cornerstone of our city for decades. It is much more than just a building. The Jewish community center is a place where the families gather, seniors stay active, children learn, cultural traditions are celebrated, and the community connections are built. I've been there many times, so I've learned so many good things from the community. It is also a very important organization, including the Vancouver Holocaust Education Center. So every time I go there, my heart really has it. So I think we should just really preserve that new education for generations to come. And also, this proposal will deliver a modern, expanded Jewish community center with a theater, a credit center, fitness facility, youth and senior space, art and cultural programming, childcare, community gathering space. You know, it has everything we need and has everything I like about this new proposal. And also deliver, you know, we talk about child housing, 630 purpose-built rental housing and also non-profit housing as well. And also this location makes sense. You know, we need to add more density in this particular location. It's a walking distance from the Canada Line, frequent transit, and also rapidly evolving Oak Ridge Town Centre and surrounding by the neighbourhood. It's equally important that we invest in community infrastructure and support the... the growth in our city. And also one thing, one perspective I want to acknowledge because of the significant investment at a time when Jewish community around the world have experienced a rise in anti-Semitism. So supporting this renewal of Jewish community center sends a very clear message that Vancouver values inclusion, diversity, and the contribution that Jewish community has made and continue to make in our city. So yeah, so with that, 100% support this application. I can't wait to see the grant opening. Thanks.

Thank you.

Councillor Bligh.

Yeah, thanks very much. I just really want to say congratulations. This is exciting. And, you know, there are, as was pointed out by the applicant, very few projects where all of the benefits are delivered first, which is why I had to clarify many times, I felt, actually, just to make sure I was reading this correctly. So, yeah, I can feel, and I remember my first meeting with Karen, actually, in an office not too far from here. in City Hall talking about this project. And again, so we do get the honor of sitting in these chambers for many, many, many hours. And sometimes we see projects as they come through the different iterations. And so I can feel the excitement and the pride and the enthusiasm from the applicant. And I'm sure it's felt broadly in the community for finally being able to break ground on this project and get going. And I'll just say too that as... Someone in also this council supported faith-based land redevelopment. This is really what it's about. It's recognizing stewards in our city that have cared for the lands that they own and have Title II and what they can do with it to benefit community. And whether it's housing or whether it's a full, complete package here, Our job as a city is to work with those land owners to make sure that they can provide and really set a vision, achieve those goals, and provide the benefit back to the community that they see is fit and that they see matters, and our job is to help make that happen. So a little shout-out to Faith-Based Land Redevelopment is an effort that I know our staff continue to work on and is something that I think is a huge opportunity for our city. So congrats to everybody here, and thank you.

Okay, thanks very much. That completes the item here, or the discussion. So a reminder that any council member participating virtually whose video is disabled will be marked absent for the vote pursuant to Section 1413 of the Procedure Bylaw. I'm now going to call the vote.

Clerk 20:02:08

Clerk, can you take us to the voting screen?

And that...