Columbia Park Renewal Concept Plan

Motion 4 · Board Committee Meeting – March 30, 2026, March 30, 2026

Carried Location Columbia Park, Vancouver Moved by Scott Jensen Watch recording

Summary

  • Concept plan approved for the renewal of Columbia Park in the Oak Ridge neighbourhood, including:
    • A synthetic turf sports field (110m x 70m fenced area, with a 100m x 64m playing surface) positioned above an underground stormwater detention tank managed by City Engineering
    • A new larger inclusive playground with nature play elements, replacing the existing playground displaced by tank construction
    • A blue-green stormwater edge on the western boundary, connecting to the Alberta Street Greenway and citywide habitat corridor
    • A washroom building, fenced dog off-leash area, loop pathways, and green open space
    • Total estimated cost: $19 million, split approximately 50/50 between Park Board and City Engineering; Park Board share approximately $9.7 million to be sought in the 2027-2030 capital plan
  • Tank designed for a 100-year lifespan; field access points kept separate so the field would not need to go offline for maintenance
  • Synthetic turf chosen for compatibility with subsurface infrastructure and to support year-round use equivalent to four natural grass fields; EPDM infill specified (no crumb rubber); mitigation measures include storm interceptors, perimeter mesh, and low curbs
  • Engagement conducted over three rounds since 2021; strong community support for playground and dog off-leash area; mixed feedback on synthetic turf
  • One commissioner opposed, citing: the tank constitutes a 100-year encumbrance on parkland; downstream infrastructure will be sized around the tank, making removal unlikely; the cost-sharing framing obscures that all funds come from taxpayers; engagement did not explicitly present synthetic turf as an outcome; and the phased approach defers the dog park to a later phase
  • A youth soccer representative spoke in support, noting the particular value of lit turf fields during Vancouver's eight-month wet season

Vote

Public comments

👍 In support
Read all 1 statements
Darren Sherbot Vancouver Youth Soccer Association · Volunteer support

Statement Watch

Hi, can you hear me?

Yes, we can. Great. You'll have three minutes if you could just state your name, who you're representing, and your position on the matter. You'll have three minutes. I'll let you know when your time's up. Thank you.

Thanks. I can be brief on this one. Darren Sherbot, volunteer with the Vancouver Youth Soccer Association. We represent over 7,000 kids and about 12,000 parents in Vancouver. Any initiative that the park board is going to advance that's going to provide an artificial turf field with lighting is well overdue, and you have your unanimous support from this user group. Questions about the field size and whether it has shock pads and multiple linings to support other groups were answered previously, so that's encouraging. Well, it'll be both a multi-use long pile turf field with shock pads, etc. I want to make one note, though, on the number of hours and the difference between the grass fields and an artificial turf field is that you need to also look at the ratio of inventories that you have available in the summer during the winter. The AT fields with lights in the winter provide value when you can use them on dark, rainy nights. And in the summer, we have an abundance of grass fields that we can look on. So in your analysis of hours, you should also consider the fact that there is an abundance of fields that we can use in the spring and the summer, and those fields are effectively not available as grass fields for those winter times, which is most critical for almost eight months of the year. Thanks. That's all from me.

Great. Thank you. That was very short. Do any commissioners have clarification questions? Thank you very much for calling in today, Darren.

Transcript

75 segments

Okay, our first staff report this evening is titled Columbia Park Renewal Concept Plan. This will be introduced by Director Mack of Planning and Park Development.

Good evening, Commissioners. I'd like to introduce the project team. I'll start with Park Board staff stepping up to the table. Associate Director Ian Stewart, Landscape Architect Sophie McNeil, who will present tonight, and supported... In the audience by Ben Mulhall, in the brown jacket and blue shirt in the audience, our senior project manager and team lead. Also, importantly, I want to recognize our colleagues and partners in this project. The general manager of the city engineering department, Lon LeClaire, is in the audience, as is Amy Sidwell, director, urban watersheds, sewers, and drainage. They'll be able to respond directly to any questions you have for the engineering aspects of the project. And we have Rob Lukes, associate director of strategy and planning for green infrastructure, part of... Director Sidwell's team on the line as well. So I'll do a brief introduction and then hand the floor over to our park board staff to present. The proposed concept plan before you this evening is a collaboration with the city's engineering department. This concept for the future of Columbia Park, including an underground stormwater detention tank, has been in the making for several years and had been previously supported by board directions and policies as well as community engagement. It proposes necessary infrastructure to support not only rainwater management and the prevention of downstream flooding in the catchment area, but importantly also to reimagine a park within the Canby Corridor plan area, a development area projected to accommodate 40,000 new residents over time. That's a lot of people pressure coming to this former suburban neighbourhood park.

Staff are seeking your approval this evening of the concept plan and forward-looking agreements with the engineering department. We're also seeking your advocacy for funding the project in the upcoming 2027 to 2030 capital plan. Thank you. And Director Stewart and landscape architect, Sophie McNeil, take it away. Thank you. Thank you. Good evening. My name is Sophie McNeil. I'm a landscape architect and the park development project manager for the Columbia Park Renewal Project. I'm pleased to be here this evening on behalf of the entire project team to present this project, which is the result of a close collaboration between Park Board and Engineering Services and reflects a coordinated cross-departmental approach to delivering much-needed park renewals and critical infrastructure in a way that maximizes public benefits. Next slide. Does that work? Oh, I can do it. Great. Thank you. Is it this one? OK. So this presentation will include an overview of the public engagement process and the proposed concept plan, including the integration of an underground stormwater detention tank that will help prevent downstream flooding. This information is being presented in order to support the board in considering a decision on that proposed concept plan. And to further support that decision and the associated recommendations, in this presentation we'll also be providing an overview of the project's background, policy context, and funding considerations.

As illustrated in the timeline at the bottom of this slide, you can see that the project has involved extensive coordination, engagement, and analysis. and has now reached a key milestone where a board decision is required to advance the project to detailed design and construction and to allow for integrated and coordinated design work to continue with city engineering.

So I'll begin with some brief context and background to explain the importance of this project at this particular location and at this particular time. Columbia Park is located in the Oak Ridge local area I'm just east of Cambie Street and the Oak Ridge development and just south of 41st Ave within the neighborhood that's experiencing significant growth and change as part of the broader Cambie corridor and also transit-oriented development. This project was originally initiated as part of the Alberta Street Blue-Green System and Columbia Park Renewal Project to address several interconnected priorities, including population growth and densification, sewer separation and infrastructure capacity, climate resiliency, park services, and connectivity. Together with Alberta Street, this project represents an early step towards the van play vision of Little Mountain to Big River and supports a more connected system of parks and open spaces throughout our city. Finally the Columbia Park renewal is not only guided by specific directives within van play and one water It also aligns with many other park board and city strategies including the urban forest strategy sports field strategy Rain City strategy and people's parks and dogs So now with that context this slide shows the proposed Columbia Park concept plan, which has been designed to address those interconnected and overlapping complex priorities. Some key features we wanted to highlight in this plan includes along the westernmost edge of it is the blue-green edge, which integrates rainwater management and habitat in the park, while also linking it to the broader Alberta Street Greenway and citywide habitat corridor. There is also a synthetic turf sports field that's located above an underground stormwater detention tank. This amenity was chosen for compatibility with the required infrastructure and to support year-round recreation in a high-density context. There will also be a new larger inclusive playground that includes nature play elements. plazas and loop pathways to support accessibility, recreation, and social connection, a washroom building that will replace the existing Portland loo, green open space for informal socializing and recreating, and a fenced dog off-leash area. The extents of phase one that you can see on the plan were based in part

on which existing park elements will be impacted by construction of the detention tank, which was detailed in Appendix B of the report, and also along with careful consideration of prioritized park servicing priorities. So for example, the current playground is located where the underground infrastructure will be installed and its replacement aligns with the park's broader playground renewal priorities. making it a clear priority for this initial phase of work. So this next slide provides an overview of the engagement. As mentioned, engagement played a really important role in shaping the concept plan. It was carried out over three rounds beginning in 2021 as part of the broader work with Alberta Street Blue-Green System. Activities included a Shape Your City page and surveys, four public information sessions, on-site signage, and meetings with interested parties, including the Vancouver Field Sports Federation. This slide shows three photos from the 2024 public engagement that happened on-site when we were sharing the draft of this concept plan that you saw tonight. Highlights from what we heard at that engagement included strong excitement for a new larger playground with shade, a fenced OLA and green open space. There was some mixed feedback on fence synthetic turf with some preference for natural lawn, but overall there was support for the recommended concept.

For financial considerations, the total estimated project costs for Columbia Park concept phase one is 19 million, to be cost shared with engineering. This amount does include construction costs and associated soft costs like project management and consulting fees, permitting and contingencies. For funding, funding for phase one includes an engineering contribution that is up to 50% cost share for this first phase of park renewal to compensate for the use of parkland and replacement of existing impacted features for an underground stormwater detention tank.

For the park board contribution of this initial phase, it will require a funding allocation of approximately $9.7 million in the 2027 to 2030 capital plan to advance detailed design and construction pending board decision. The estimated annual operating impact to the capital budget is about $44 million. $440,000, including $60,000 for synthetic turf operations.

And before we move into the recommendations, we just want to briefly include a couple of slides to provide some additional context about why a synthetic turf field, which is a significant part of the project costs, was recommended for this project.

We recognize this is a topic that is a point of interest for the community, and it's important to understand the context and broad recreational planning and its proposed location above an underground attention tank in a densifying area. While the upfront capital cost is higher than a natural turf field, synthetic turf supports significantly more use, helping the park deliver year-round recreation that's the equivalent of four natural turf sports field. In high-density areas like Oak Ridge, natural turf is particularly challenging to maintain. It requires rest and recovery periods that are difficult to enforce. And strategies like fencing often leads to unintended uses, such as dogs, and making the limiting overuse not very effective. The sports field strategy details more information about synthetic turf. And it also specifically recommends this surface when subsurface infrastructure, such as a detention tank, is required. One of the key reasons for that is that it reduces the risk of service disruptions and ensures a reliable plain surface.

This next slide just shows a breakdown of that high-level comparison between a natural and synthetic turf field in terms of the service levels, cost considerations, operations and maintenance, and further notes on the compatibility of it with an underground tank. But we're not going to go into those in details. We just wanted to include it here for reference and a reminder of the rationale behind the recommendation for a synthetic turf field in this location.

So finally, that brings us to the recommendations included in the report for decision tonight.

They are A, that the Vancouver Park Board approve the concept plan for the renewal of Columbia Park as described in this report and shown in the appendices. B, that the Vancouver Park Board approve of the use of a portion of Columbia Park for an underground city stormwater detention tank managed by the city's engineering department. And C, that the Vancouver Park Board authorize the general manager of parks and recreation and the City's Engineering Services General Manager to finalize and execute funding and land use agreements for the use of Columbia Park by the Engineering Department for a stormwater detention tank to the satisfaction of the General Manager of Parks and Recreation.

So that includes the presentation. We welcome any questions.

Thank you so much.

Commissioners, any questions for staff?

Mr. DP uh Yes, so I am NOT a fan of synthetic turf at all Do you happen to know is how long would it sin turf last how many years till it has to get replaced?

Do you happen to know that Yeah, we would we typically Require field replacement after 10 to 15 years That's the general. Yeah

Okay, and is there any way that that stuff is ever recycled or does it just go into the dump? As far as we know, do you have to know if they improve techniques of recycling that at all or is it just garbage?

Commissioner, we're always looking into ways to be more sustainable as an organization. At this time, that would be streamed to the landfill. I think it's also important to balance the inputs that are required for natural turf versus synthetic turf.

The inputs being that natural turf also requires, it's got to be mowed every 10 days, every 5 to 10 days.

That's right, those maintenance inputs, irrigation, and fertilization.

Fertilization, and that's high carbon as well? Okay, and so then there's the question of crumb, the crumb infill, and there's different kinds of infill. I understand there's different kinds, and we're going to see it in the next motion where we're talking the same thing at Beaconsfield. It's possible to use this organic infill, is it? I was reading it was like walnut, crushed walnut shells. Is that a reasonable cost? Like, could that be done at a reasonable cost?

Commissioner, at this time, the Park Board has specified for any of our renewals or new synthetic turf fields to use an inert EPDM material. We have researched many of the different info materials as part of the sports field strategy. At this time, in our climate, in the Pacific Northwest, We know that those organic-derived materials, such as walnut shells and coconut-based small particles, they do not do well in our climate. We're certainly open to continuing to work with suppliers and benchmark with other municipalities to see if that material does perform. But at this time, we've done that extensive work to conclude that EPDM is the safest material. We certainly will not use any crumb rubber because of its toxic effects.

Okay, very aware of that. So then one last question is, so this crumb infill, I'm worried it's going to flow into the streams. I mean, this is a very important blue-green waterway, and what's the quality of technology that can prevent the crumb rubber from washing off the field and into these very important streams that you want to put in?

Yeah, that's very important to us as an organization. And as you know, we have environmental staff in-house. We will not be doing anything with our new construction that leads to the introduction of that material into waterways. So we're taking a number of measures. That will include storm scepters, collection devices with filters on them.

We will not be removing the snow off these fields. That's a major contributor to migration of that material. And we'll have mesh, again, around the perimeter. We'll have low curbs to contain that material. So any of these new facilities will be built with all best practices to reduce that migration.

Thank you.

Commissioner here.

Thank you for the information. Just a quick question. The company that you're sourcing the turf field from is a Canadian or is it being sourced from abroad? Do you know yet?

We do have specific regulations in our specifications around where that material is sourced and our suppliers need to provide that. I don't have that at my fingertips tonight, Commissioner, but we can provide that as a follow-up.

Commissioner Bastavansky.

Thank you for this interesting concept plan. My question is around the type of, about the size of the field. So what are the dimensions and what sports would be able to use that space?

Yeah, thank you for the question. So currently the concept design field size we're assuming will be 110 metres by 70 meters, which can accommodate the typical 100 meter by 64 meter standard playing field with a safety buffer. But we did want to note that in the concept design, you can see that a larger area is actually fenced beyond that field area. And that is to include additional fenced in space for warm up areas, storage, player benches, and to accommodate sort of flexibility in detail design with the appropriate sports field sizes.

Okay. And I think that space is currently quite heavily used by the Ultimate group. And I'm wondering, will they be able to use that field?

Do you want to? Yes. Yes. Yeah. Yes.

Okay. And I know with a number of our new fields and renewals, we've incorporated long pile and a shock pad to reduce the risk of injury to players and reducing the risk of concussion. Is that going to be the case on this field as well?

Do you have a? Yes.

Okay, thank you. And now this is partly paid for by engineering, but can you help me understand, is this project coming as a trade-off from doing Oak Park gravel field conversion? Because in the sports field strategy, Oak Park was ahead of Columbia. And so are we making a trade-off here?

Commissioner, I don't know that we would consider this a trade-off. This is an opportunity that we've partnered with engineering on, and it does prioritize Columbia. I know that we also have significant density coming to this neighborhood, so I think we would see it more as an opportunity than a trade-off.

Yes, thank you. My last question is, so we are losing some sports fields. So right now you've got diamonds and a grass field. Which groups are being displaced and how are they being accommodated?

So at this time, the displaced users would primarily be the ball players, softball, baseball. And we do intend to work closely with those groups as part of the allocation policy work to determine how we can accommodate them elsewhere.

Yes. Okay. Thank you.

I'm just going to ask a couple questions about the detention tank. What's the lifespan of a tank like this?

I will ask our engineering staff that we have us here tonight to support us with that question. Thanks.

Is it okay? Wait, wait, wait. Just a second. Hold on. We've got to do some mic situations. I think he wants to answer online.

I'm just going to ask Rob Lukes to answer that question. Okay. He's online. Hello. Rob Lukes, I'm the Associate Director for Green Infrastructure and Engineering Services.

And these detention storage systems are designed to be around the same lifespan of the sewer system itself. So about 100 year lifespan.

And how much maintenance is typically required on a tank like this? And I guess the quality of that is what kind of off, like how often would the turf need to be taken offline and how long would it be offline for maintenance on the tank?

I don't expect the turf system to ever be taken offline to maintain the tank. The access points would be off the field. And it also will include a manufactured treatment device. So there'll be an upstream system that is treating water before it goes into the detention tank. So that would be capturing a majority of the sediment before it gets into the tank. So that reduces the maintenance. within the storage underneath the fields. So the manufactured treatment device is more like the oversized manhole that could be on the edge of the park or even within the street.

Okay, I guess my last question is about, so the downstream system, it flows into what is right now a combined sewer. And the report was talking about that Metro Vancouver has limitations in their system and they don't have plans to upgrade their trunk sewer. But my understanding is that Metro Vancouver has a goal of eliminating combined sewer overflows by 2050. So when Metro Vancouver does upgrade that and the combined sewer gets separated, what's the plan for this detention tank at that point, which I assume would be before 2050?

So yeah, the detention tank, because it has a long lifespan, we can still use it to accommodate additional rainwater that we expect with climate change. We do continually work with Metro Vancouver on their infrastructure planning and capital planning. And so right now we're working with them on our healthy waters plan, which is helping prioritize where they do their sewer separation around the city on their trunks. And so this particular trunk is lower on their priority list. And so we're not sure of the exact timing. It's not within their

10-year plan right now, so they're working on other priorities. And the future sizing of these sewers, would they take into account the detention system or not take into account that?

We would be telling them the flows that we would anticipate coming from our system so that they would be taking that into account.

Okay.

That's good. Thanks.

Oh, and I will say, sorry, just one thing. Because the system is for stormwater, It shouldn't go into kind of their system. They just want to be managing a sanitary system. Once they separate their system, we anticipate that those drainage assets will actually end up belonging to the city of Vancouver at some point.

And will the drainage, the storm side of the city system, that'll be sized to account for the fact that there's a detention tank there? Yes. Okay, thank you. Commissioner Jensen.

Thank you. I have a number of questions in regards to engagement, but prior to that, I just wanted to know if the, in regards to what type of field this will be, will this field meet our direction six of local First Nations and be lined for Indigenous sport as well?

Thank you, Commissioner. We have submitted a referral on this project. We have submitted an update, and pending your decision tonight, we'll submit another update to the host nations, and that is the opportunity for the host nations to express what their expectations are for this project.

Okay, wonderful. Thank you. In regards to engagement, this is, as we say with turf field, we're doing the work of four grass fields. Does this neighbourhood, will this neighbourhood be able to support the increase in potential car traffic and parking that will occur with the additional users coming to this space? And has the neighbourhood been consulted in regards to that?

Commissioner, through our engagement, we typically don't ask specific questions or speak to those. We are aware of potential impacts with this, but at the time we did receive strong support for the improvements to this park. We also know that this is a very... changing neighborhoods. So the single family, you know, type of typology of housing you see there will look quite different. And there are already some towers that have been constructed within the last year or so. So we are aware that there will be initial peak periods of vehicle traffic. It's also important to note that we're in a major transit oriented development center. So we expect many people will be coming to this field using public transit as well.

okay um in regards to the um engagement uh the addition of sports lighting uh what was the community response to um the potential of having sports field lighting up to 10 p.m um you know a street across from their home was there any specific feedback you can share

There was not specific feedback, Commissioner. We'll also be going through a development permit process where the community will also have an opportunity to provide additional feedback.

Okay. And finally, are there any plans or do you foresee any sort of changes to the parking regulations in that neighbourhood? which currently are unmarked to either having permit-only parking or going to timed parking, that would limit the access to those streets to those that are currently residing in that neighbourhood.

Commissioner, it would be difficult to speculate on the future parking configuration, but should that community find that things were not meeting their expectations, they would have that ability. to connect with the City of Vancouver and potentially have parking regulations changed. We've got one addition in behind. Yes, Lon LeClair, General Manager of Engineering Services. Yeah, we're always adjusting parking regulations on the street actively when streets come under pressure. So when we start to see streets that are having excessive demand, then we bring in the regulations, and those are done in consultation with the adjacent businesses, users, and residents.

Can I ask one follow-up, if I ask the Chair? Thank you. The decision today will be approved by this board or not. But if it is approved and changes are occurring to that neighbourhood and parking, that does not come back to this board. Am I correct?

With respect to our on-street management, it's actually delegated to the city engineer. So all the changes that occur on streets related to regulation is very responsive. Changes, you know, every year. So it's kind of an ongoing commitment to kind of serve residents and businesses and adjacent users as best as we can.

Okay, thank you so much.

Are you finished? I'm done.

Thank you so much.

I just had a question. You mentioned that this was going to require an official development permit that would have community feedback at this time. It seemed from the report that the timelines were quite tight. When would you sort of expect that the public would be providing input into this?

Because we're changing the use of this field and erecting high-mass lighting, that typically does trigger development permits. So next steps will be working with our colleagues in engineering to put a scope of work out to public. And at that same concurrently, we'll be working with the Planning and Development Services Department on this development permit. Okay. So it could happen quite quickly.

Okay. Thank you. Thank you. Are there any further questions from commissioners? Seeing none, thank you very much for your presentation today. Appreciate it.

So we have only one speaker for this item right now. One of our speakers withdrew. We have Darren Sherbet by phone. Darren.

Hi, can you hear me?

Yes, we can. Great. You'll have three minutes if you could just state your name, who you're representing, and your position on the matter. You'll have three minutes. I'll let you know when your time's up. Thank you.

Thanks. I can be brief on this one. Darren Sherbot, volunteer with the Vancouver Youth Soccer Association. We represent over 7,000 kids and about 12,000 parents in Vancouver. Any initiative that the park board is going to advance that's going to provide an artificial turf field with lighting is well overdue, and you have your unanimous support from this user group. Questions about the field size and whether it has shock pads and multiple linings to support other groups were answered previously, so that's encouraging. Well, it'll be both a multi-use long pile turf field with shock pads, etc. I want to make one note, though, on the number of hours and the difference between the grass fields and an artificial turf field is that you need to also look at the ratio of inventories that you have available in the summer during the winter. The AT fields with lights in the winter provide value when you can use them on dark, rainy nights. And in the summer, we have an abundance of grass fields that we can look on. So in your analysis of hours, you should also consider the fact that there is an abundance of fields that we can use in the spring and the summer, and those fields are effectively not available as grass fields for those winter times, which is most critical for almost eight months of the year. Thanks. That's all from me.

Great. Thank you. That was very short. Do any commissioners have clarification questions?

Thank you very much for calling in today, Darren.

You're welcome.

So that brings us to the end of our speakers. Would somebody like to move the recommendation to see Commissioner Jensen? Seconder, Commissioner Bastiwanski. We'll now discuss the recommendation. Commissioners, if you have comments, go ahead and cue in.

Anyone want to comment? Thank you. Commissioner Bastiwanski.

Yeah, I think it's wonderful that we've been able to find a way to share the cost between city and park, solving an engineering problem, an environmental problem, and a capacity issue with sports fields. You know, as the speaker just described, sometimes in winter, like we can't use grass fields, even if it has lights on, like it rains in Vancouver. I don't want to state the obvious, but that happens and the grass gets wet. And so turf field is really great for a whole variety of sports. We need to keep people active and outdoors. And it is a really wonderful way for people to build community and make friends at the darkest time of year. Those that have like those hobbies that run around outside in the wet and in the dark and in the cold, and they're doing it with friends. You know, as an outside observer, you might wonder why would they be wet and cold and happy. But it is a really important part of life in Vancouver. So I think, like, the board, like, I'm going to support this. I think the board should get behind this. Any opportunity to create a space where people can connect and make those friends is a massive bonus. And we're way behind on the number of fields. I think it's wonderful that we're doing it with long pile on the shock pad. The shock pad is really a way of like improving safety for those users. And I am really glad to see that those are being used across all our fields because we want people outside. So I'm going to support this. I think it's a great way for city and park to get together and work to something. And I thank staff for bringing this to us. Thank you.

Thank you very much. Commissioner Digby.

Yeah, well, as I said, so I am obviously reluctant about the sin turf aspect of this. We know the environmental cost of synthetic turf. We know that it gets really hot during summer days and in a way that grass fields do not because they're always humid and evaporating water from them. So, you know, I'm thinking about... voting against. But then this is part of the blue-green infrastructure that the city has to put in place to manage increased rainfall across the city in the coming years. And I see this fabulous blue-green edge running down the western side, which really brings opportunities for real kind of biodiversity in there and various plantings and various engagement with plants and shrubs along there that can be really meaningful to people that live in these high density neighborhoods. Well, given that, and plus the phase two of the project, which will be happening later, really does keep the green field space. So, again, I'm stuck in one of those tough decisions. Would I vote against this overall? I guess the answer is no. I can live with another centre for the valuable reasons my colleague suggested, Commissioner Bazduvansky, and so I will be supporting this because of its important role in the blue-green infrastructure of the city.

Commissioner Howard, online.

Fine. Thank you. Yes, I will be supporting this park and field. This is a wonderful project. And we just don't have enough of those in Vancouver. We need to build more of them and we need to build them faster. These sports have been proven to be the best way to get people. away from their screen, especially the kids, and into good health. So I'm 100% behind this project.

Thank you.

Commissioner Jensen.

Thank you. I too am going to be supporting this. I'm a big supporter of sport and activation within our community. And so the initial concern I have is making sure that community is engaged. And I know staff do a very thoughtful job in that engagement. I actually visited... during that engagement at Columbia Park and met with not only staff but with residents and had a chance to hear how they felt about this new opportunity happening in their backyard. It is a very robust plan that is coming in two phases and again you know I would have idealized a no tank and natural grass field and you know, looking at Oak Park investment, but with the tank, there needs to be this investment in this turf field. But, you know, I think that in the end, you know, that is a rapidly changing neighbourhood, and I think that the neighbourhood will grow appropriately around this field as a destination park. And, you know, the phase two, you know, is very inclusive of so many great opportunities. And again, echoing Commissioner Digby, I really appreciate the rainwater and the green zone. Anytime you're walking past those in our growing city, you start to see and you appreciate what they bring to the neighbourhood. So very excited to support this tonight.

Commissioner Herr, do you have any comments? Okay, great. I appreciate the Commissioner's comments on this, and I do like the addition of new playing fields or inventory. I always like to see parks being renewed, but I do have some issues with this project for a couple reasons. The primary one, this is a significant encumbrance on our parkland. I appreciate that we do need this as a detention tank based on increased development pressures and downstream limitations. But I take issue with the fact that we're locking in this tank in our future piping considerations that this tank will always be here. This means that this tank is going to be on our land for over 100 years, and potentially we would have to replace it with a new tank in 100 years because the downstream infrastructure is going to be designed with this tank in mind. So for the very long future of the city of Vancouver... We are going to be limited in what we can do in this parkland. I think we all know how critical our parkland is, and especially in these dense neighborhoods, that we aren't going to get more parkland. So I think it's concerning that we're limiting to what we can do on our parkland by putting these engineering structures on them. I do hope that staff will reconsider redesigning the piping downstream so that we could eventually have the option of removing this tank in the future so that we aren't encumbered in the future of what we want to do on our parkland. I know that's an increased cost to consider that, but I do think we need to value our green space in that way. I also sort of take issue with the cost that we're painting this as a cost savings to the park board That you know somehow we're getting extra bonus infrastructure Because it's being split between the city and the park board ultimately all this money is coming from the same source It's the taxpayer money and really I think we should be asking why we need to give up our land for a hundred years to get some basic park improvements. I think we should be able to get park improvements without having to give up our land for that. I also have a little bit of concerns about the engagement, and I hope that there'll be some further engagement on this. The phase two engagement never really mentioned explicitly synthetic turf. A lot of the engagement that I read was people looking for green natural space. and sort of, yeah, lots of grass and green space. And I think that synthetic turf isn't necessarily the best interpretation of that. And I think we're pushing this synthetic turf in a non-ideal location just because of this tank that we need to put in, which I've already talked about having issues with. And finally, I think the phased approach has really pushed off some of the other amenities, like the dog park is not in phase one. I would have liked to see that happen concurrently with this so that we can do the whole park and all the amenities together. So ultimately, I would like to support this, but I do have serious concerns about the impact on the long term of our park here. And I know that this is a very important piece of land for this community, and I think we should be having a long term picture. of how we're using our land. So unfortunately, I won't be able to support this tonight.

So seeing no further comments from commissioners, I'll call a vote by a show of hands. All in favor? I see Commissioner Bastiowanski, Commissioner Digby, Commissioner Jensen, Commissioner Heron, Commissioner Howard. All opposed? Commissioner Christensen. So that does carry. Thank you, everyone.

Okay. We are going to move on to our second item. I'll let staff do a little shuffle before. Thank you, everyone. Thank you, staff, all for coming out. Engineering team.

OKAY. WE'RE GOING TO MOVE ON TO OUR SECOND REPORT, WHICH IS TITLED BEACON'S FIELD PARK SYNTHETIC TURF FIELD CONCEPT PLAN. THIS WILL BE INTRODUCED BY DIRECTOR MACK AGAIN.