Disaster Risk Reduction Funding Application
Motion 10 · Council Meeting, April 25, 2023
Summary
- The City applied to the Union of BC Municipalities' Disaster Risk Reduction–Climate Adaptation (DRR-CA) program for up to $2,008,010 in provincial grant funding, covering 100% of eligible project costs with no required City contribution.
- Three projects are proposed: a Coastal Vulnerability Assessment of Vancouver's English Bay shoreline and park assets ($118,000); a flood preparedness warning tool for the West Southlands neighbourhood near Musqueam Creek ($90,010); and remediation of deteriorating Oak Street and Fraser Street sewer outfalls along the Fraser River, including new tide gates to reduce flood risk ($1,800,000).
- The Musqueam Creek tool builds on joint work with the Musqueam Indian Band following the 2021 atmospheric river flooding event, and will help both the City and the Band plan future flood mitigation.
- The Oak/Fraser Street outfall work addresses infrastructure identified in 2020 as in very poor condition; structural failures and blockages have been increasing the frequency of local flooding.
- If approved, grant funds would be added to the 2023–26 Capital Plan, freeing up existing City capital to advance additional projects under the Climate Emergency Action Plan and Climate Change Adaptation Strategy.
- Staff recommend Council endorse the application; a previous DRR-CA application in 2022 was successful, netting the City $975,000 for similar climate-resilience work.